Kärntnermilch steps into the future

Manual processes replaced by an automated high-bay warehouse 

Dairy cooperative Kärntnermilch commissioned Kardex Mlog to transition their traditionally manual storage operations to an automated, temperature-controlled high-bay warehouse. As their general contractor, Kardex Mlog added approximately 3,000 storage spaces in less than 12 months and minimized operational failures by a buffering system.

Find out how Kardex Mlog helped Kärntnermilch:

- add approximately 3,000 pallet storage spaces in a minimum footprint

- integrate innovative technology to protect against operational failures

- implement seamless integration into the material flow between production and goods receipt, production and shipping

High-bay_warehouse_Case_Study_EN_Kaerntner

 

Download Case Study